精品人妻久久久久久888,久久久久亚洲AV成人无码电影,亚洲免费在线不卡高清视频,中文无码一区二区不卡AV,精品国产你懂的在线观看,日韩精品中文字幕有码,在线看片日本一区二区,成a人片在线观看久亚洲,亚洲无AV码一区二区三区,国产高清精品在线一区二区

    1. <span id="kqklj"></span>
      <menuitem id="kqklj"><dl id="kqklj"></dl></menuitem>
      <rt id="kqklj"><small id="kqklj"></small></rt>

      1. Shandong Zhongrui Construction Machinery Co., Ltd official website!

        National Service Hotline:
        15005366588
               CONTACT US
        Shandong zhongrui construction machinery co. LTD
        Address : 3701 Zhuangjian Road, Kuiwen Economic Development Zone, Weifang City, Shandong Province, China
        Zip code:261041
        Phone:86-536-2288189 
        Manager li:15005366588
        URL:www.diegan.cn
        Email:15005366588@163.com 
        News Center

        YT28 Rock Drill Series: (faults and troubleshooting methods)

        If you encounter problems when using the YT28 air-leg rock drill, please try to solve it according to the methods provided below.  
         

        Fault category Reason How to eliminate
        Drilling speed decreased Working air pressure is too low 1. Check the air supply system of the air compressor and ensure the output pressure .
        2. Appropriately reduce the number of rock drills working at the same time, or reduce other gas-consuming operations.
        3. Check if there is any leakage in the pipeline, and deal with it.
        4. Shorten the length of the gas pipeline (the length of the gas pipe should be controlled within 15 meters), and replace the gas pipe and valve switch whose aperture does not meet the requirements.
        Poor lubrication Inject oil according to regulations, and ensure that the oil path of the oil injector is unobstructed. It is strictly forbidden to work without lubrication or use grease lubrication
        Incorrect shank size The length of the shank should be 108±1mm, and it should be corrected if it is too long or too short.
        Part failure Replace failed parts in time.
        The waterway is not clear, water is leaking from the end of the machine head or water is poured into the machine 1. Replace the broken water needle in time.  
        2. The center hole of the drill rod is blocked or too small, and the drill rod should be replaced.
        3. The diameter of the water needle does not meet the specifications (generally not less than 3 mm), the water needle should be replaced.
        4. The water pressure is higher than the air pressure, causing high-pressure water to flow back into the machine and destroy the normal lubrication of the machine. At this time, the water pressure must be lowered.
        Insufficient thrust of the air leg or poor expansion and contraction 1. The rubber wrist of the air leg is worn or loose, and it must be replaced or reassembled in time.
        2. The frame body and the outer tube are loose, causing the upper and lower chambers to blow through. The frame body must be tightened.
        3. The seal is damaged or lost and should be replaced.
        4. The expansion ring of the pressure regulating valve is worn out and cannot be accurately positioned and should be replaced.
        5. The reversing valve is worn or the reversing valve snap ring (YT24-3.01) is missing, which causes the reversing valve to be shifted. Parts should be replaced and supplemented.
        6. The trigger is worn, the stroke is not enough when the reversing valve is compressed, and the air leg is not easy to retract. The trigger should be replaced.
        Excessive machine vibration 1. The air leg and the ground support angle is too large or the thrust is insufficient, resulting in a large recoil force of the machine, the angle should be changed to increase the thrust.
        2. The shank bushing is worn too much, causing the machine to swing, and the shank bushing should be replaced.
        3. The bending of the drill rod causes unstable operation, and the straight drill rod should be replaced.
        Broken water needle Seriously piled up at the small end of the piston Replace the piston
        Large matching clearance between the shank and the shank When the size of the hexagonal opposite sides in the shank sleeve is severely worn, it must be replaced in time
        The center hole of the shank is not correct or does not meet the size requirements The shank should be trimmed as required
        Failure of air-water linkage The water pressure is too high Take measures to reduce the pressure.
        Air and water paths are blocked Inspect and remove blockages in gas, water pipes, filling valve bodies, and waterways.
        Fatigue failure of water injection valve spring Replace the spring
        The air barrier and water aprons are ineffective Check and replace the seals
        Corrosion Clean and remove rust
        俺去鲁婷婷六月色综合| 欧美激情一区在线观看| av色哟哟一区二区三区| 欧美高清亚洲欧美一区| 亚洲福利av一区二区| 国产欧美日韩精品综合在线| 日韩精品国产精品国产| 亚洲欧美日韩精品在线| 欧美人妻少妇精品久久黑人| 亚洲av不卡一区二区| 中文字幕av一中文字幕| 黄色污污污网站在线观看| 亚洲av黄片一区二区| 国产成人亚洲综合精品| 久久国产乱子伦精品片| 亚洲AV福利无码无一区二区| 未满十八在线观看网站| 激情视频在线观看国产中文| 激情文学综合亚洲二区| 久久精品国产99国产精品导航| 亚洲国产成人精品无码区在线观看 | 美女被啪啪到高潮喷水视频| 亚洲AV成人无码一区二区三区在线观看 | 日本在线人成精品视频| 中文精品一卡2卡3卡4卡葡京| 亚洲av有码免费在线| 国产熟女高潮一区二区| 欧美视频一区二区色哟哟| 国产婷婷综合在线视频| 五月婷婷综合久久狠狠| 国产精品自拍资源在线| 91爽看水蜜桃在线观看| 日韩av高清不卡一区二区三区| 黄色的三级的亚洲的免费| 久久丰满熟妇人妻中文字幕| 国产无套粉嫩白浆在线| 欧美一区二区在线播放网| 熟妇人妻一区二区三区| 久久久无码精品亚洲日韩精东传媒| 尤物视频在线播放一区| av一区二区不卡久久|